Kitchen Remodel | Design

Kitchen-Design-Header

We’ve gone through about 3 demo’s on this kitchen, so I think it’s time to share some design and lighten the mood! We have most of our selections made, not all of them, but the big ones. So here I’ll share what we know for design direction for the kitchen remodel.

Continue Reading

DIY Milk Paint Table

milk paint header

DIY Refinishing Furniture Using Milk Paint

Have you ever played around with milk paint? I’ve used it a few times before and I’ve got to tell you, I’m officially hooked. It’s so easy to work play with. Here’s an easy DIY project that gives new life to old furniture, like this coffee table.

Before

White Table DIY Milk Paint

Joe’s coworker Steve dropped off this table for my garage sale and I thought, “Hmmm, this would look great downstairs!” It wouldn’t be the first time I found something to keep from my own yard sale…

Continue Reading

DIY Rustic Bathroom Shelves

diy rustic shelves

DIY Rustic Industrial Shelves

I have to confess. This is my favorite part of the entire bathroom. (If you missed any of the bathroom remodel that we did this past winter, you can recap right over here.) I knew I wanted some really chunky wood shelves for the little nook above the toilet, but Joe surprised me with something better than I could have imagined.

cutting bathroom shelves

Continue Reading

Shower Pan Part 2: Lining and Final Pour

pouring a shower pan

 

Insane in the Membrane

The shower “membrane”, that is. After your shower pre-slope is fully dried— you waited 48 hours, right?— you can place the shower liner in and do your final pour of shower mix (sand and cement mixture). Then it’s smooth sailing. Honestly, don’t skip the pre-slope! Without it, your water will sit and mold will grow below your shower’s surface. Ewww, nobody’s got time for that.

Continue Reading

Pouring a Shower Pan

pouring a shower slope

Pre-Slope

All we do is work work work work work. Thanks Top 40 radio for that one. We’ve been listening to the same 40 songs all spring break due to limited music options. But, back to the task at hand.

This video is lengthier, so feel free to breeze through it at your own pace. The pre-slope is a one night project, but it’s important to give it plenty of time to dry (48 hours to be safe) before advancing to the rest of the shower pan. We’ll walk you through the steps.

 

 

Continue Reading

Hardware: Modern Bathroom Vanity, Sink & Shower Ideas

Bathroom Hardware Header

 

Time for Ideas

It’s never too early to start thinking about the finishing touches, right? But honestly, we need to start ordering what we want, so we need to decide on styles we like. We’ve picked out most of our tile, so that’s all taken care of. The hardware is taking its cues from the tile color. For the bathroom entrance, I’m in charge. For all things shower, Joe’s the man.

Continue Reading

Movie Room Roundup

movie room updates

Little Updates, Big Difference

Well this room has certainly come a long way since it was here:

Continue Reading

Movie Theater: Phase Two

movie theater room

Door Prize

We’re in business! Hollywood is calling, I can see our names written in the stars now: Nominees for Best Door award! I’d like to thank the academy…

Start here for the beginning of the door project, and go here for the final product.

Continue Reading