Pouring a Shower Pan

pouring a shower slope

Pre-Slope

All we do is work work work work work. Thanks Top 40 radio for that one. We’ve been listening to the same 40 songs all spring break due to limited music options. But, back to the task at hand.

This video is lengthier, so feel free to breeze through it at your own pace. The pre-slope is a one night project, but it’s important to give it plenty of time to dry (48 hours to be safe) before advancing to the rest of the shower pan. We’ll walk you through the steps.

 

 

Continue Reading

Bathroom Demo | Phase 2

Bathroom Remodel Phase 2

Bathroom Background

Let’s back up a little and talk about this bathroom remodel. If you missed the first video, pop over to that and come back here when you’re done watching. Here’s a little intro of us getting hyped up to start, and me swinging a sledge hammer for the first time! Awww, my first (intentional) hole in the wall.

Continue Reading